Holy Family RC Primary

Summer 2016 works included to re-cover remaining low pitched roof surfaces following on from Phase 1 works in summer 2015.

Works included thermal upgrade of the roof surfaces to meet current building regulations and to re-clad high level fascia
boards and replace rainwater goods.

Blessed Sacrament RC Primary

A scheme of works was designed and implemented to create additional office space in part of the existing school hall area.  The scheme was also designed so as to enable future upwards expansion of this office space at first floor level when further space is required by the school.

Our Lady and St Edwards RC Primary

Two separate schemes were completed over the summer holiday period. The first was to refurbish Year 3 and 4 WC facilities at the school incorporating  modern cubicles and sanitary ware. We also completed a scheme of safeguarding works which included to provide a range of boundary fencing and gates to the perimeter of the school.