Royal Mail Group, Midlands
Industrial · Mail centre refurbishment
JYM were appointed by Royal Mail Group to deliver a significant programme of upgrade works to a mail and parcel sorting facility in the Midlands, acting as Project Manager, Building Surveyor and Principal Designer throughout.

- Client
- Royal Mail Group
- Sector
- Industrial
- Services
- Project Management, Building Surveying, Principal Designer
- Status
- Completed
Upgrading a sorting facility that never closes
Works were carried out across the site and included:
- Replacement of the fire alarm system
- Replacement of the CCTV installation
- Replacement of dock levellers and traffic doors
- Installation of new high-speed doors
- Replacement of personnel doors
- Installation of bird netting
- Replacement of the passenger lift
- Refurbishment of staff shower facilities
- Replacement of external yard drainage
- Roof repairs
- Repairs to operational yard surfaces
- Replacement of the vehicle weighbridge
The main challenge was keeping the site running, as it operates 24 hours a day, seven days a week. The works were carefully programmed and phased to keep disruption to a minimum.
All works were delivered on time and within budget.
Gallery
Project photography

Our work
More case studies

Leisure
King George V Playing Fields, Adlington
New two-team football changing pavilion with a community room
Read case study
Education
Our Lady's Catholic High School, Fulwood
RAAC remediation works for the Lancaster Diocese
Read case study
Healthcare
Oakfield Nursing Home, Forton
19-bedroom extension to an existing care home
Read case study