JYM have recently certified completion on an initial Phase of Structural Façade Repairs to Majestic Apartments building in Lytham St Annes. This milestone marks a significant step in our ongoing commitment to assisting the Management Company of this prominent Apartment Block repair the building to ensure that it is structurally safe for years to come.
Phase 1 was designed as a test / exploratory phase and included around 25% of the front elevation. Key works included:
- Demolition of the external brickwork leaf and comprehensive inspection and assessment of existing structural elements
- Targeted repairs to address embedded steel corrosion and concrete defects.
- Replacement of wall ties and cavity trays
- Replacement of outer leaf masonry with durable bricks including glazed brickwork for aesthetic interest
- Refurbishment of balconies including replacement of balustrade with modern looking steel and glass system
With Phase 1 now complete, planning for Phase 2 is already underway with a start planned for spring 2026. This next stage will continue our efforts to repair the building and improve its long-term resilience.
Thanks to Reid Jones Partnership Structural Engineers, Rosslee Construction and Realty Management for their contribution to the success of this initial Phase of works.