Majestic Apartments, Lytham St Annes - Facade Repairs

CLIENT:  CLIFTON DRIVE MANAGEMENT
JYM SERVICES:  PM, BS, Arch, PD

JYM were appointed by the management company at Majestic to assist them with rectification of structural deficiencies to the building facade. Key works included:

  • Demolition of the external brickwork leaf and comprehensive inspection and assessment of existing structural elements
  • Targeted repairs to address embedded steel corrosion and concrete defects.
  • Replacement of wall ties and cavity trays
  • Replacement of outer leaf masonry with durable bricks including glazed brickwork for aesthetic interest
  • Refurbishment of balconies including replacement of balustrade with modern looking steel and glass system

JYM provided lead design and PM / PD role and worked with other consultants to initially identify extent of building problems and develop a brief through to completion of the initial test phase of works.  Second phase of wider repairs to the building completes in 2027.